This note provides information about the limitations and special considerations in GRC Process Control 10.0. Please contact your local SAP office for detailed information about translation and country availability of SAP GRC Process Control 10.0.
Solution
GRC-SPC
Freigabe mit Einschränkungen
PC3.0 crystal report templates need to be re-implemented after upgrade
If customers in PC 3.0 have created new or modified SAP delivered crystal report templates, they will need to re-implement these reports after the upgrade.
( Changed at 30.09.2010 )
GRCSPC cannot be installed in the same client with PS-RM
For the Release GRCSPC (GRC Process Control), a restriction consists of the joint operations of this application with Public Sector Records Management (PS-RM) in a client. The two applications CANNOT be operated together in a client. Use different systems or operate the applications in different clients.
( Changed at 30.09.2010 )
Non-SAP RTA's of predecessor release will be available by end of rampup
Third party RTA's of predecessor release will be available on the SAP Service Marketplace free of charge by the end of rampup.
( Changed at 18.11.2010 )
Affected
Releases
|
Check https://service.sap.com/sap/support/notes/1503796 to download support packages
No comments:
Post a Comment